Delivery & Readiness Status · Supreme ModelTX

Delivery and Readiness Status

Current engineering readiness, active dependency status, delivery gate progress, and immediate next steps. This page is updated as part of the ongoing engineering cadence.

Last updated: 30 June 2026

Current readiness summary

Complete

Baseline evidence

Initial model and evaluation runs recorded with reproducible artifact references.

Active

Benchmark pipeline

Configured and operational with maintained repeatability documentation.

Active

CI/CD pipeline

Automated build, test, and deployment workflow operational.

Active

Governance documentation

Architecture, evaluation, delivery, and risk documentation maintained.

Pending funding

GPU readiness

Provider options evaluated; procurement pathway documented. Activation pending funding confirmation.

Planned — Phase 3

Production hardening

Scoped to Phase 3 (Days 61–90). Dependent on Phase 2 GPU benchmark completion.

Planned — Phase 3

Pilot deployment package

Scoped to Phase 3. UK-hosted infrastructure target selection pending.

Planned — Phase 2

Model card publication

Scoped to GPU benchmark cycle completion in Phase 2.

Phase 1 delivery gate: status

The following gate criteria must be met before Phase 2 commencement. Current status against each criterion:

  • Baseline evidence pack published — Evidence pack pages are live and reviewer-accessible at orkinosai.com/evidence.
  • Architecture documentation current — Architecture overview documented and maintained on site.
  • Risk register maintained — Risk register with current mitigations published and available for review.
  • 90-day delivery plan documented — Phase plan with gate criteria and dependency declarations published.
  • 🔄 GPU provisioning pathway confirmed — Provider selection and procurement pathway documented; quota confirmation pending funding.
  • Assessor briefing available — Technical briefing available on request via contact page.

Active dependency status

Managed GPU compute quota

Required for Phase 2 (31–60 day) GPU benchmark cycle. Provider options evaluated; procurement pathway documented. Activation contingent on funding confirmation.

Managed Funding confirmation

Phase 2 and Phase 3 deliverables require confirmed funding. Phase 1 proceeds on current baseline. Submission in progress.

Monitored UK infrastructure selection

UK data-centre and private cloud options evaluated for Phase 3 deployment pathway. Selection deferred to funded phase.

Engineering cadence

Active engineering progress is demonstrated through the following ongoing activities:

  • CI/CD pipeline: Automated build, test, and deployment workflow is operational and actively maintained.
  • Documentation cadence: Architecture, evaluation, delivery, and governance documentation is updated as part of the engineering workflow — not produced retroactively.
  • Governance iteration: Policy gating intent, access control design, and audit signal structure are being refined in parallel with engineering implementation.
  • Risk register reviews: Dependency register and risk mitigations are reviewed at each significant implementation stage.
  • Evidence packaging: All primary evidence artifacts are maintained in a reviewer-ready state throughout the engineering cycle.
Assessment access: A structured technical walkthrough is available on request to review engineering artifacts, run records, and governance documentation in detail. Contact the team via the contact page.

Request a readiness review

Assessors can request a structured walkthrough of current readiness, active dependencies, and immediate next steps.